Surveying
Closed Traverse: Loop and Link Traverses Explained
Summary
A closed traverse provides an independent check on its own observations. A loop traverse returns to its starting point, and a link traverse ends on a different known point. Both allow angular and linear misclosure to be computed and adjusted; only the link traverse also checks the scale and orientation of the control.
Definition
Closed traverse: a traverse that starts and ends on points of known position, either the same point (loop) or different points (link).
- Loop: same start and end
- Link: different known ends
- Allows misclosure checks
- Can be adjusted
Loop traverse
A loop traverse is efficient for site control because it needs only one known point and one reference direction. Angles can be checked against (n − 2)·180°, and coordinates must return to the start. However, a wrong starting azimuth or a scale error in the distance meter rotates or scales the whole loop without creating any misclosure.
Link traverse
A link traverse starts on one pair of known points (station and backsight) and ends on another (station and foresight). The closing azimuth and the closing coordinates check orientation, scale and position. This is the preferred geometry for route surveys and for densifying control between GNSS points.
Field checklist
- Occupy and check the starting control; observe a reference object.
- Measure each angle on both faces with the number of sets required by the specification.
- Measure distances in both directions where possible.
- Record instrument and target heights.
- Close on known control and check before leaving site.
FAQ
Is a loop traverse enough for control?
For small sites it is common, but it cannot detect a scale or orientation error. Tie into a second control point or GNSS baseline when accuracy matters.
What is the difference between a closed and an open traverse?
A closed traverse ends on known control and can be checked and adjusted; an open traverse ends on an unknown point and cannot.
Related tools and articles
Tools
- Traverse AdjustmentBowditch and Transit adjustment with closure report.
- Field Visit SurveyRecord and check field observations.
Articles
- Link Traverse (Connecting Traverse)A link traverse starts from known control with a known backsight and ends on different known control with a kn…
- Open Traverse: Uses, Risks and ChecksAn open traverse starts on known control but ends on a point of unknown position, so it provides no misclosure…
- Traverse Adjustment: Complete Guide for SurveyorsA traverse adjustment turns measured angles and distances between control points into a consistent set of coor…
- Angular Misclosure in Traverse SurveysAngular misclosure is the difference between the sum of measured traverse angles and the value geometry requir…
- Control PointsReference topic
References
- Ghilani, C. D. & Wolf, P. R. Elementary Surveying: An Introduction to Geomatics, 15th ed., Pearson, 2018 (traverse computations and adjustments).
- Uren, J. & Price, W. F. Surveying for Engineers, 5th ed., Palgrave Macmillan, 2010.
Cite this page
GeoCAD Bridge. “Closed Traverse: Loop and Link Traverses Explained.” GeoCAD Bridge Knowledge Center, updated 2026-10-05. https://www.geocadbridge.com/knowledge/survey-closed-traverse/