Leveling

Differential Leveling: Height of Instrument Method

Updated · GeoCAD Bridge engineering team · 8 min read

Summary

Differential leveling measures height differences by reading a staff on a known point (backsight) and on the next point (foresight). The height of instrument is the known elevation plus the backsight; each new elevation is that height minus the foresight. A run between two benchmarks is checked with ΣBS − ΣFS and its misclosure is distributed in proportion to distance.

Definition

Differential leveling: determining the height difference between points from horizontal sight readings on vertical staffs.

  • HI = Elev + BS
  • Elev = HI − FS
  • Check: ΣBS − ΣFS = ΔH
  • Allowance ≈ C·√K mm (K in km)

Height of instrument method

HI = Elevation(known) + BS Elevation(new) = HI − FS

Turning points (TP) carry the height forward: each TP receives a foresight from one setup and a backsight from the next.

Misclosure and allowance

Closing on a second benchmark gives the misclosure = observed − known. Allowances are usually C·√K millimetres, with K the run length in kilometres and C depending on order, for example about 4 mm to 12 mm. Use your specification.

Adjustment

For a single run, distribute the misclosure in proportion to the cumulative distance (or number of setups) to each point. For networks of runs, use least squares weighted by 1/distance.

Good practice

  • Balance backsight and foresight distances to cancel collimation and curvature errors.
  • Keep sights short in heat shimmer.
  • Use a change plate and keep the staff vertical.
  • Run two-way (forward and back) for control.

Worked example

Leveling from BM1 (100.000 m) to BM2 (known 101.250 m):

Field book, height of instrument method.
PointBSHIFSElevation
BM11.523101.523100.000
TP12.104102.6400.987100.536
TP21.876103.1741.342101.298
BM21.928101.246
ΣBS − ΣFS = 5.503 − 4.257 = +1.246 m Observed BM2 − BM1 = 101.246 − 100.000 = +1.246 m ✓ arithmetic check Misclosure = 101.246 − 101.250 = -4.0 mm over 365 m
Distance-proportional adjustment.
PointCum. distance (m)ObservedCorrectionAdjusted
BM10100.000+0.0000100.000
TP1120100.536+0.0013100.537
TP2255101.298+0.0028101.301
BM2365101.246+0.0040101.250

Step by step

  1. Set up. Set up midway between the benchmark and the first turning point.
  2. Backsight. Read the staff on the benchmark; compute HI.
  3. Foresight. Read the staff on the turning point; compute its elevation.
  4. Move forward. Move the instrument; backsight the same turning point.
  5. Close. Finish on a known benchmark and compute the misclosure.
  6. Check and adjust. Verify ΣBS − ΣFS, compare with allowance, distribute the misclosure.

FAQ

Why balance sight lengths?

Equal backsight and foresight distances cancel the effect of a tilted line of sight (collimation error) and most of the curvature and refraction effect.

What is a turning point?

A temporary, stable point on which the staff is held for a foresight from one setup and a backsight from the next.

Can GNSS replace leveling?

GNSS gives ellipsoidal heights. Converting to orthometric heights needs a geoid model, and the result is usually less precise than careful leveling over short distances.

Tools

Articles

References

  1. NOAA National Geodetic Survey. Geodetic Leveling, NOAA Manual NOS NGS 3, 1981.
  2. Ghilani, C. D. & Wolf, P. R. Elementary Surveying: An Introduction to Geomatics, 15th ed., Pearson, 2018 (traverse computations and adjustments).
  3. Uren, J. & Price, W. F. Surveying for Engineers, 5th ed., Palgrave Macmillan, 2010.

Cite this page

GeoCAD Bridge. “Differential Leveling: Height of Instrument Method.” GeoCAD Bridge Knowledge Center, updated 2026-10-05. https://www.geocadbridge.com/knowledge/survey-leveling/